Project Overview:
Project Name: A Large-scale Public Cultural Venue
Industry category: Public buildings
Project Address: Changsha, Hunan Province
Operational project: Comprises a staff education center, a sports center, a cultural center and service facilities all in one.
Project Background:
A municipal workers' cultural center is a key public cultural project in the local area. It is led by the Municipal Trade Union and has a total construction area of approximately 62,000 square meters, with a total investment of 475 million yuan. It covers four major functional sections: the workers' education center, the workers' culture center, the workers' service center, and the workers' sports center. The project has set higher requirements for the intelligentization, greening, and scene-based design of the lighting system. Considering the policy orientation, project positioning, and actual operational needs, it is imperative to launch the intelligent lighting renovation project.
Project Requirements:
Grade-based permission management: Assign exclusive operation permissions to administrators, operation personnel, and regional managers to standardize the operation process and avoid the risk of accidental operations.
Zone-based intelligent energy-saving control: Lighting is independently managed in different zones. During unoccupied periods, it automatically dims or turns off the lights, balancing both user experience and energy-saving benefits.
Energy consumption statistics analysis: Automatically generate lighting energy consumption reports by area and time period, precisely identify high-energy-consuming zones, and provide data support for energy-saving optimization decisions.
Solution:
Intelligent lighting system and platform operation and maintenance customization
Scheme Value:
Empowering value through experience: Tailored for diverse scenarios, enhancing the quality of public cultural services
Energy-saving and cost-reduction value: Implementing the dual-carbon strategy to achieve green and low-cost operations
Operational efficiency improvement value: Intelligent control, reducing management pressure
Case Benefits:
Efficiency improvement:
Combined with the intelligent dimming module, it can automatically adjust the brightness according to the scene requirements and the intensity of natural light, eliminating the phenomena of "constant lighting" and "excessive lighting". It is expected that the lighting energy consumption will decrease by more than 30%.
The intelligent control rate of lighting equipment is ≥ 99%, and the response time for remote operation is ≤ 2 seconds. This eliminates the reliance on manual on-site operations.
The response time for switching between lighting scene modes (performance, training, exhibition) is ≤ 30 seconds, and the scene adaptation efficiency has increased by more than 85%.
Improvement in quality/accuracy:
The accuracy rate of data collection for lighting equipment operation and energy consumption is ≥ 99.9%, the error in manual calculation is reduced to 0, and the accuracy rate of data traceability is 100%.
The accuracy rate of the emergency lighting linkage response is 100%. In case of emergencies (fire/power outage), the emergency switching time is ≤ 1 second, ensuring the safety of evacuation.
Successfully passed the green building two-star and public building energy-saving related ratings, with a compliance pass rate of 100%, meeting the requirements of the higher-level management.