Renovation of laboratory environmental control in a well-known listed architectural design company

24-11-05

1784006622192222.png

Project Overview: 

  • Project Name: Renowned Listed Architectural Design Company 

  • Industry category: Design Institute 

  • Project Address: Wuhan, Hubei Province 

  • Operation Project: Engineering consulting, design and supervision services for civil construction projects and industrial engineering projects 


Project Background: 

The first listed company in the domestic architectural design industry successfully entered the capital market in 2014. Its central headquarters building is located in Wuhan Junshan New Town in the central region, with a total construction area of approximately 40,000 square meters. After completion, it can accommodate over 2,000 people for office use. The project was designed and constructed according to high standards such as "Three-Star Architectural Design Certification" and "US LEED Gold Certification", and it intends to introduce a number of high-end design companies to create a regional design capital demonstration park in the local economic development zone. 


Project Requirements: 

  • Intelligent Control and Maintenance: The control and maintenance of mechanical and electrical equipment in traditional office buildings heavily rely on manual operations. There are common industry pain points such as low maintenance efficiency, high labor costs, and difficulties in identifying potential faults in advance. Customers have proposed leveraging new-generation information technologies like the Internet of Things and big data to empower the construction of an intelligent equipment control and maintenance system, aiming to achieve the core goal of cost reduction and efficiency improvement. 

  • Comfort and energy conservation in harmony: Traditional building automation systems are unable to achieve a dynamic balance between the comfort level of employees and the energy-saving goals of the building. Excessive cooling and excessive heating are prominent energy waste phenomena. Customers require that, while strictly ensuring the indoor environmental comfort, they can achieve the set energy-saving targets. Moreover, through refined energy consumption monitoring and the implementation of the entire process energy management measures, they aim to eliminate ineffective energy consumption and reduce the overall operating costs of the building. 


Solution:

Soft and hard integrated building intelligent control system and energy consumption management platform 


Scheme Value: 

  • Intelligent optimization, multi-dimensional enhancement of experience; 

  • Reduce operation and maintenance costs and increase asset value; 

  • Energy conservation and emission reduction, along with reduced energy consumption, contribute to the expected achievement of the "LEED Gold Certification" for the property owner. 


Case Benefits: 

Efficiency improvement: 

  • Realize the integration of the building automation system BAS + the energy management system EMS + the digital twin IBMS platform, which enables real-time mapping of equipment status in a 3D model, allowing for panoramic viewing of the entire building and one-click control of the entire building. 

  • Overall energy-saving rate: Overall building energy consumption reduced by 18% to 22% 

  • Energy consumption growth rate: Reduced by 20% or more 

Benchmarking Model Effect: 

  • Data assets: Full lifecycle energy consumption / equipment / environmental data, supporting green certification, carbon disclosure, and energy-saving renovations. 

  • Demonstration value: A benchmark for intelligent and green design of buildings in Central China, forming a replicable intelligent operation model for research and development office buildings. 

  • Green Building Three-Star Design Mark 

  • LEED BD+C Gold Certification 

  • Green Construction Demonstration Project of Hubei Province 

  • Low-carbon Building Pilot Project in Wuhan City